Emerald Exteriors
Roofing & siding · Armbrust Acres

Your block.
Done right.

We've roofed homes near 168th & W. Center Rd. We know the materials your covenant approves, and we handle the board paperwork with your architectural review committee.

Schedule my free inspection or call (402) 330-0999
HOA-approved materials Board paperwork handled No down payment
Hero photo · Armbrust Acres home exterior
Westfield Circle · Spring 2024
DaVinci shake — close-up
Siding · LP SmartSide
12
Homes done in Armbrust Acres

Replacements, repairs, and storm work since 2010 — addresses available during your consult.

4.9
Average homeowner rating

80+ reviews from Omaha-area homeowners on Google.

$0
Required down at signing

You pay only after the work is done right. We never collect at the door.

What your neighbors chose

Recent projects in Armbrust Acres.

Three roofs we'veput on in your subdivision. We'll share the addresses and the homeowners' names during your consult — they're happy to talk.

What your covenant approves

Five material familiesyou can install.

Per the Armbrust Acres HOA covenant. We carry premium options in every family — bring the look you want and we'll match it to a product line.

Composite slate

DaVinci, Brava, EcoStar — must read as shake or slate.

Wood shake

Cedar shake. The only material that skips board sign-off.

Asphalt shingle

CertainTeed Landmark, GAF Timberline, Owens Corning Duration.

Standing-seam steel

Painted and Galvalume systems.

Tile

Concrete and clay tile. Uncommon in this subdivision.

Something not on this list?

Ask. We'll tell you up front whether it's worth a board variance.

From your covenant: Wood, steel, slate, tile, and asphalt are all permitted. Synthetic materials are allowed but must have a shake or slate appearance. No specific brands are named in the covenant.Read on www.armbrustacres.net →

Board paperwork

We submit it. ARC reviews it. You're approved.

Armbrust Acres requires board sign-off for most roofing work — wood shake doesn't require board sign-off. Either way, we handle the application end-to-end.

1

We prepare the packet

Spec sheets, color samples, written scope, photos of the existing roof. You review and sign.

2

ARC reviews it

Two to three weeks typical. We follow up with your committee weekly until we have a written approval.

3

We schedule install

Once approval is in writing, we schedule. Tarped landscaping, daily site sweep, photo handoff at finish.

Ridge detail · close-up
Material close-up
Foreman on the roof
Finished gable
Schedule an Emerald Eye Inspection

No obligation. No pressure to decide.

We walk the exterior, take photos, and tell you what we see. Whether it's an emergency, routine maintenance, or purely cosmetic, we'll talk you through it before you decide to move forward.

  • Photo-documented inspection
  • Written scope and estimate
  • No down payment required
Common questions

Quick answers, no fluff.

How does the board approval process work?
We prepare the application with material spec sheets, color samples, and a written scope. You sign it; we submit it to your architectural review committee and follow up until you have a written approval. Most Armbrust Acres approvals come back inside two to three weeks.
What if I want a material the covenant doesn't list?
We'll tell you up front whether it's worth a variance request. Some boards consider appearance-matched alternatives; others won't. Either way, we won't start work on something that risks a covenant dispute.
Do you handle storm-damage insurance claims?
Yes. We document damage with photos during the inspection, meet your adjuster on-site, and supply the line-item scope your insurer needs. You handle the claim; we handle the technical side.
How long does a typical install take?
Asphalt: one to two days. Composite slate or wood shake: three to five days, weather-dependent. We tarp every night and never leave open decking overnight.
Is the inspection really free?
Yes. A 20-minute walk, a written photo report, and a clear recommendation — yours to keep whether you hire us or not.

See where your roof stands, Armbrust Acres.

A 20-minute walk, photos in writing, a clear recommendation — tailored to your covenant.